Project by: Civil Engineering and Development Department
Scope : The works mainly include ground treatment and site formation works; construction of carriageway, footpaths, cycle tracks and a public transport interchange within the Loop; construction of Western Connection Road Phase 1 through widening of existing Ha Wan Tsuen East Road, which includes construction of footpath, cycle track, slopes, retaining walls and a vehicular bridge over the old Shenzhen River meander; provision of other infrastructures, including a tertiary sewage treatment works and sewerage system, water supply system, drainage system, and other associated works; and environmental mitigation measures including about 18 ha offsite wetland compensation and about 1.3 ha offsite woodland compensation.
Commencement Date: 15 July 2021
Completion Date: 2026