Development of Lok Ma Chau Loop - Site Formation Works


The construction site photo of the Lok Ma Chau Loop provide by Orange News


Project by: Civil Engineering and Development Department

Scope : The works mainly include ground treatment and site formation works; construction of carriageway, footpaths, cycle tracks and a public transport interchange within the Loop; construction of Western Connection Road Phase 1 through widening of existing Ha Wan Tsuen East Road, which includes construction of footpath, cycle track, slopes, retaining walls and a vehicular bridge over the old Shenzhen River meander; provision of other infrastructures, including a tertiary sewage treatment works and sewerage system, water supply system, drainage system, and other associated works; and environmental mitigation measures including about 18 ha offsite wetland compensation and about 1.3 ha offsite woodland compensation.


Commencement Date: 15 July 2021

Completion Date: 2026